| EID utilizes all of the documents prepared during the previous project phases to work closely with selected users at the client locations to evaluate and identify both technology-based and non-technology based changes. |
|
During these meetings EID develops new, or anticipated, process charts documenting how the processes would operate with the selected technologies. These technology based changes are documented in the system design document including information on the new workflows, application modules, user interfaces, and management reports required by the client. |
 |
This document will include all necessary information allowing for the development of the acceptance testing criteria to validate those components delivered by the selected vendor. This portion of the project will result in the development of a detailed project schedule with clear and measurable milestones allowing the client to monitor the progress of the project. |
|